Content
20. 8.
2018
New Reactor Control Panel
The new reactor control panel was installed during the summer outage.
7. 6.
2018
New fuel for VR-2 arrived
Today, the fuel for the new VR-2 subcritical assembly arrived from Finland.
26. 3.
2018
The Fire Brigade Training
The fire brigade underwent special training in dosimetry and detector handling.
Additional information